Follow a timber building from factory to finished record
An invented four-storey cross-laminated timber (CLT) building with 20 parts. Each part carries a QR code. Scanning it brings together four kinds of record, kept by different people, that until now never talked to each other.
DPPProduct passportWhat the part is, where it came from, who has had it.
EPMSite observationsMeasurements and checks on the part. Parts only, never people.
DBLBuilding logbookWhere each part sits in the building, as built.
DTwAssembly twinLive picture of progress, read from the other records.
One QR code, four records
Each record has its own owner and stays where it is. The QR code carries one web address, the part's ID, and a link service uses it to fetch the right pieces from each record.
P03CLT floor panelScan for passport
The QR label is fixed to the panel at the factory. It stays on the panel through the yard, the lorry, the crane and the building.
IDWhat the QR holds
DPPProduct passport
The part's own record
Batch L27-01546, certified timber source
Made Mon 4 Jan, left the yard Wed 6 Jan
Scanned in at the site gate the same evening
Written by: the factory, the dispatch yard, the site gate. Kept by: the manufacturer, for the life of the part.
EPMSite observations
What was measured on it
Moisture 11.9% at the factory, 11.8% and 18.5% on site
Crane load 2,318 kg; placed 3.6 mm from design
34 fixings; inspection passed
Written by: meters, the crane, the surveyor, inspectors. It records the part, never the person.
→
DBLBuilding logbook
Where it is in the building
Level 1, east zone
Sixth part installed, Tue 12 Jan 11:55
Linked to its element in the building model
Written by: the site's building model (BIM). Kept by: the building owner, for the life of the building.
→
DTwAssembly twin
Progress at a glance
Reads the logbook and the observations, stores nothing new
Shows what is made, on the road, on site, up and inspected
Flags gaps, clashes and disagreements on the day they appear
Used by: the site team and the client. See tab 3.
Floor panel P03, from the press to the logbook
Eight days, eleven records, each from a different source. The colour of each dot shows which record it went into.
Plant manager"Did everything we sent arrive, and is anything going to come back to us?"
The factory reads its own passports (DPP) plus the site observations (EPM) that concern its parts. It does not need access to the rest of the site's data.
DPPPassport20parts made
EPMObservations20passed the factory check
DPPPassport19with a record of leaving the yard
DPPPassport20scanned in at the site gate
Needs your attention
Missing record
Beam G02 arrived on site with no record of leaving the yard
The site gate scanned its QR at 19:00 on Wed 6 Jan, but its passport has no dispatch entry. Either it went out on a lorry that was never logged, or the dispatch scan failed. Until this is filled in, its chain of custody has a gap.
DPPFound in the passport
Query from site
Panel P03 left at 11.9% moisture; the contractor measured 18.5%
Two site readings 35 minutes apart disagree by 6.7 points. Your factory check supports the lower reading. The system does not pick a winner; it asks a person to decide.
EPMFound in the site observations
Everything that left the factory
Part
Type
DPP Made
EPM Factory check
DPP Left yard
DPP Arrived on site
Site engineer"What is on site, what is up, and what do I need to sort out before the next lift?"
DTwAssembly twin
This is the digital twin: a live picture of the building, coloured from the passports (DPP), the site observations (EPM) and the building logbook (DBL). It follows parts, not people. Tap any part to see what its QR code leads to.
PlannedMadeOn the roadOn siteInstalledInspectedNeeds a look
To sort out today
The same question, before and after
Pick a question someone on a timber project asks every week.
The question
Today
With the passport One search
The "today" column is an illustrative scenario for discussion, not a measured case. The "with the passport" answers are real outputs of the proof of concept on its invented data.